FAQ

Contact us

QQ:11199288 

Email:info@busch-sh.cn

FAX:86-21-51598598

MT:86-13816201025

Web site: http://www.busch-sh.cn

Foreign trade office address: Lingyan Road No. 728 China (Shanghai) free trade District Shanghai,P.R.C 200124

Factory address: Xiang Jiang Road1111 Jiading District Shanghai,P.R.C 201802



Question:Whether need to set cooling tower and boiler when use heat pump chiller?

A: Because the groundwater (constant temperature zone) annual temperature fluctuations, generally maintained at 10~22 deg.C, can fully meet the water source heat pump refrigeration in summer and winter heating demand.Therefore,when use water heat pump,it is no longer need to set the cooling tower and boiler.
You may be interested in: